Dog Lead - Strong And Long Leads - Soft Padded Handle Prevents Hand Burn And Aids Control - Ideal Training Leash - Smooth Chrome Clip - Stop Sore Hands Today!

Price: £13.99 £9.99
Product prices and availability are accurate as of 2017-09-25 20:28:22 BST and are subject to change. Any price and availability information displayed on http://www.amazon.co.uk/ at the time of purchase will apply to the purchase of this product.
You Save: £4.00 (29%)
Availability: In Stock
Add to Cart
CERTAIN CONTENT THAT APPEARS ON THIS SITE COMES FROM AMAZON SERVICES LLC. THIS CONTENT IS PROVIDED 'AS IS' AND IS SUBJECT TO CHANGE OR REMOVAL AT ANY TIME.

Manufacturer Description

The times of making use of poorly-manufactured and challenging-to-use dog sales opportunities ... are now over!

At Last: A Comfy, Strong AND Trendy Canine Leash Made From one hundred% Cotton!

- Created from robust normal cotton - it will not snap
- Best for canine that chew their dog leash as the solution is non poisonous
- Manage is very comfortable to keep and will in shape a big hand
- Micro-fleece lined handle will not melt away hand even if dog pulls
- Cause clip is robust and very sleek to work and connect to the canine collar
- Our cotton dog guide can be cleaned by hand washing in warm soapy drinking water

Created to a large regular in a selection of fashionable designer colors we hope that you will have many content several years of going for walks your dog with our guide.

Fulfillment Guaranteed - We are certain you will be very happy with your new obtain

Product Features

Manufactured from strong natural cotton and suitable for use with dogs weighing up to 50kg Amazingly soft and comfortable micro-fleece handle will ensure no sore hands when walking a dog that pulls Easy to use nickel-plated trigger clip for attaching lead to collar Lead is very robust and manufactured from a 2 ply cotton construction to ensure a hi-strength design Lead folds easily and is very flexible for putting into a pocket when not required

Product Information

We are very delighted to bring the amazing Dog Lead - Strong And Long Leads - Soft Padded Handle Prevents Hand Burn And Aids Control - Ideal Training Leash - Smooth Chrome Clip - Stop Sore Hands Today!. As with all our pet products we are delighted to be able to offer you a pet product that you can trust in.

This pet item provides Amazingly soft and comfortable micro-fleece handle will ensure no sore hands when walking a dog that pulls.

also provides Easy to use nickel-plated trigger clip for attaching lead to collar.

In addition this item provides Lead is very robust and manufactured from a 2 ply cotton construction to ensure a hi-strength design.

This featured item provides Lead folds easily and is very flexible for putting into a pocket when not required.


Write a Review